Tuesday, September 21, 2010

Drop ceiling installation

Drop ceiling installation it requires patience. If one plans to install a drop ceiling it is critical to keep the entire grid work as even as possible.
The correct procedures in Drop Ceiling installation, is to first, drop ceiling Installation requires patience at the beginning because it is important that all of the rows of framework be level and even. The spacing of the framework is critical for the tiles to fit properly into place. A good job looks nice and lasts for years. An inferior job reminds one that every time they see it of its poor quality. Since there are few ways to hide the mistakes when installing a drop ceiling, take time and do it right. By following a few rules, the job should be done in a few hours and look great, too.

Next in drop ceiling installation is to measure the length and width of the room. Because one will be buying the framework for the ceiling tiles to rest in and the tiles themselves, one needs to know how much material is needed. Depending on the size of the tiles, one will need enough long rails to cross the room once for each row of tiles plus one more for the final run. The same is true for the cross tracks. The rows of the framing start on the wall and end on the opposite wall. Get tracks designed for the walls and those for the rest of the room in the proper quantity. Buy a few more tiles than the size of the room requires allowing for cutting and potential waste. One will also need the eyelets for attaching the suspension wires to the old ceiling and wire.

In drop ceiling installation one should start by attaching the track to the walls all of the way around the room. This process in drop ceiling installation is started by measuring the amount that the ceiling is to be dropped and marking a level line around the perimeter of the room. Use this line for a guide as one attaches these tracks permanently to the walls. The next step in drop ceiling installation is to measure out the proper spacing for the grid work and install the eyelets that will hold the suspension wires into the old ceiling. The next step in drop ceiling installation is to thread the wire through each eyelet and let enough wire hang free to reach the level of the new ceiling plus several inches to allow you to tie off the grid as it is put into place.
Next is to run the grid work. Row by row, run the long tracks across the room and secure each section with enough wires to make it solid. Install the cross grid next following the same routine until the entire grid is in place. One should have tile sized openings throughout the room with partial tile sized openings along the walls and in the corners.
Install lighting where it is necessary. Most of the time existing wiring for the previous lighting in the room can be utilized for installing the new lighting fixtures to go above the drop ceiling. Run the wires to the fixtures and set the fixture into the grid. If it does not have its own opaque lens, install a tile sized lens beneath it in the grid opening. Test the lights before continuing the drop ceiling installation.
Another job in drop ceiling installation is one should start in the middle of the room and put the tiles into place. By starting in the center of the room, one will have installed all of the whole tiles before one has to begin making the cuts near the walls. Carefully measure the size of the tiles needing cut and cut them to fit the opening. Make sure that all of the tiles are sitting properly in place. When the last tile is fitted, the drop ceiling installation job is completed.